Condensation management: what the NCC asks for

Editions covered: NCC 2022 (current in most states), NCC 2025 (WA, VIC, ACT) · Last reviewed 15 November 2026

Mould in a new house usually traces back to one of three places. Moisture is trapped behind the cladding, steam from wet areas is vented into the roof, or a cold roof space has no airflow. The NCC deals with all three in Housing Provisions Part 10.8. This is the part of the guide where NCC 2022 and NCC 2025 differ most, so check the edition first.

Which edition?

  • NCC 2022 applies in NSW, QLD, SA, TAS and the NT.
  • NCC 2025 applies in WA, VIC and the ACT from 1 May 2026. WA and the ACT allow a 12-month transition.
  • When NSW and Tasmania move to NCC 2025, their variations keep the 2022 version of Part 10.8.

Where the rules are

  • NCC Volume Two H4P7: risks from water vapour and condensation must be managed to protect occupants' health. It applies to Class 1 buildings.
  • H4D9: the deemed-to-satisfy route is ABCB Housing Provisions Part 10.8:
    • 10.8.1: external walls
    • 10.8.2: exhaust systems
    • 10.8.3: roof spaces
    • 10.8.4: roof spaces where the insulation runs parallel to the roof (NCC 2025 only).
  • AS 4200.1 and AS 4200.2 (pliable membranes, 2017 editions referenced): cited by number only.
  • The ABCB's free Condensation in Buildings handbook explains the background.

Key requirements: NCC 2022 (HP 10.8)

  1. Wall wrap (10.8.1(1)): where a pliable building membrane is used in an external wall:

    • it complies with AS 4200.1
    • it is installed to AS 4200.2
    • it sits on the outside of the primary insulation.
  2. Vapour permeance (10.8.1(2)): any membrane, sarking-type material or insulation layer outside the primary insulation must be at least:

    • 0.143 µg/N.s in climate zones 4 and 5
    • 1.14 µg/N.s in zones 6, 7 and 8.

    The ABCB explains these as AS 4200.1 vapour control Class 3 or 4 in zones 4 and 5, and Class 4 only in zones 6 to 8. It also notes that many foil-faced products have low permeance. There are no permeance limits for zones 1 to 3 in this edition.

  3. No wrap? Drained cavity (10.8.1(3)): without a membrane, a drained cavity must separate the cladding from water-sensitive materials. Single-skin masonry and single-skin concrete are exempt.

  4. Exhaust flow rates (10.8.2(1)):

    • at least 25 L/s for a bathroom or WC
    • at least 40 L/s for a kitchen or laundry.
  5. Exhaust goes outside (10.8.2(2) and (3)): kitchen, range hood, bathroom, WC and laundry exhaust discharge to outdoor air, directly or through a duct or shaft. They don't discharge into the roof space. A venting clothes dryer must also be ducted outside. A condensing dryer isn't covered.

  6. Run-on timer (10.8.2(4)): where a bathroom or WC has no natural ventilation under 10.6.2(a) and the fan doesn't run continuously, the fan must:

    • be interlocked with the light switch
    • keep running for 10 minutes after the light goes off.
  7. Make-up air (10.8.2(5) and (6)): rooms without natural ventilation need make-up air. For an exhaust fan, that can be 14,000 mm² of openings to an adjacent room. The ABCB notes that a 20 mm undercut on a 700 mm door achieves this. A vented dryer needs make-up air to AS 1668.2.

  8. Roof spaces in zones 6, 7 and 8 (10.8.3):

    • The roof needs a space at least 20 mm high above the insulation, or above vapour-permeable sarking.
    • That space must be vented through evenly spread openings sized by roof pitch in Table 10.8.3, or sit directly under the tiles of an unsarked tiled roof.
    • Exempt: concrete roofs, structural insulated panel roofs and BAL-FZ roofs.

What changes in NCC 2025 (WA, VIC, ACT)

  • Wider scope: 10.8.1 now covers a membrane or sarking-type material used as a control layer. Any control layer between the cladding and the insulation must meet Table 10.8.1.
  • Table 10.8.1: sets vapour permeance values by climate zone, separately for walls with and without a drained and ventilated cavity:
    • Zones 6, 7 and 8: a cavity is required, with a membrane of at least 1.1403 µg/N.s.
    • Zones 4 and 5: at least 1.1403 µg/N.s with no cavity, or at least 0.1429 µg/N.s with a cavity.
    • Zone 3: at least 0.1429 µg/N.s with no cavity, or at least 0.0022 µg/N.s with a cavity.
    • Zone 1: an upper limit applies (below 1.1403 µg/N.s), so low-permeance membranes are allowed to limit moisture driven in from outside.
    • The published table doesn't list zone 2 in a row of its own, so check zone 2 walls with your building surveyor.
  • Drained and ventilated cavity (10.8.1(3) and (4)): required where there is no membrane or water barrier. The cavity must:
    • be at least 12 mm deep
    • be unobstructed and drained to the outside
    • have openings of at least 1,000 mm² per metre of wall at its base and top, or at each storey.
  • Zones 6, 7 and 8: a cavity is required, including for brick veneer and cavity masonry.
  • Exemptions (10.8.1(5)): single-skin masonry or concrete, full-height insulated sandwich panels, walls outside the envelope, and wall below natural ground.
  • Roofs (10.8.3 and 10.8.4):
    • In zones 6 to 8, the minimum roof-space height drops to 18 mm.
    • The Table 10.8.3 vent areas are revised:
      • Roofs pitched at 10° or more need 7,000 mm²/m at the eaves or low level, plus 5,000 mm²/m at high level or the ridge.
      • Flatter roofs need larger openings (20,000 mm²/m at the eaves or low level, or at opposing gable ends), with separate figures for skillion roofs.
    • A new clause 10.8.4 covers roofs where the insulation follows the roof line, such as cathedral and skillion roofs.
    • A tiled roof with no control layer above the insulation is exempt.
  • Exhausts (10.8.2): no change.

How the states differ

  • NSW: NSW Part 10.8 in the 2025 Housing Provisions keeps the 2022 version of Part 10.8 (as amended). NSW is on NCC 2022 until 1 May 2027 anyway.
  • Tasmania: adopted the NCC 2022 condensation provisions from 1 October 2023, according to CBOS. TAS Part 10.8 (2025) also keeps the 2022 version. Most of the state is climate zone 7, so the zone 6–8 rules apply to most Tasmanian work.
  • WA, VIC and the ACT: the NCC 2025 rules above apply. Check the climate zone carefully, because the cavity and permeance rules turn on it.
  • QLD, SA and the NT: the 2022 rules apply, and there is no state variation to Part 10.8.

Ask the app

Upload a photo of the wall wrap, cavity battens, exhaust duct or eave vents, or ask:

  • "What vapour permeance does wall wrap need in climate zone 6?"
  • "Can a bathroom exhaust fan discharge into the roof space?"
  • "Does a bathroom with no window need a run-on timer?"
  • "Do I need a drained cavity behind cladding under NCC 2025?"
  • "How much roof ventilation does a cathedral ceiling need?"

Ask an insulation question · HVAC · Cladding · Builder

Related checklists

FAQ

Is foil sarking allowed in walls? In NCC 2022 climate zones 4 to 8, anything outside the insulation must meet the minimum vapour permeance, and the ABCB notes that many foil-faced products don't. Check the product's AS 4200.1 vapour control class against your zone. Under NCC 2025, check it against Table 10.8.1.

What is the difference between wall wrap and sarking? In the NCC, a pliable building membrane is the wall wrap behind cladding. "Sarking-type material" is a broader term for thin flexible sheets used as a vapour or water barrier. NCC 2025 applies the wall rules to both when they act as a control layer.

Can the bathroom fan just vent into the roof? No. Under HP 10.8.2(2), bathroom, WC, laundry and kitchen exhaust must go to outdoor air, directly or through a duct or shaft.

Do I need a drained cavity behind cladding? Under NCC 2022, you need one where there is no wall wrap (except single-skin masonry or concrete). Under NCC 2025, you need one where there is no membrane or water barrier, and in every case in zones 6 to 8. It must be at least 12 mm deep and vented top and bottom.

Does the condensation part apply in warm climates? Yes. The exhaust rules apply everywhere. The NCC 2022 wall-permeance and roof-venting rules only start at zone 4 (walls) and zones 6 to 8 (roofs). NCC 2025 adds permeance ranges for the warmer zones too.


This is general guidance, not a compliance check. Always check your approved plans, your climate zone and the edition that applies to your permit, and confirm details with your certifier or building surveyor.

Based on content from the National Construction Code 2022 and 2025 (NCC Volume Two and the ABCB Housing Provisions), provided by the Australian Building Codes Board under the CC BY 4.0 licence. The ABCB does not endorse this guide. The standards the NCC references are cited and explained in our own words, not reproduced.

Sources

  • NCC 2022 Volume Two: H4P7, H4D9
  • ABCB Housing Provisions Standard 2022 (1 May 2023): Part 10.8 (10.8.1 to 10.8.3, Table 10.8.3 and explanatory notes) and 10.6.2(a)
  • ABCB Housing Provisions Standard 2025: Part 10.8 (10.8.1 to 10.8.4, Table 10.8.1 with its explanatory classes table, Table 10.8.3), NSW Part 10.8 and TAS Part 10.8. Online: https://ncc.abcb.gov.au/editions/ncc-2025/adopted/housing-provisions/10-health-and-amenity/part-108-condensation-management
  • NCC 2025 Volume Two, Part H4: https://ncc.abcb.gov.au/editions/ncc-2025/adopted/volume-two/h-class-1-and-10-buildings/part-h4-health-and-amenity
  • ABCB, Part 10.8 Condensation management (NCC 2022): https://ncc.abcb.gov.au/editions/ncc-2022/adopted/housing-provisions/10-health-and-amenity/part-108-condensation-management
  • ABCB, Condensation in Buildings handbook (2023): https://ncc.abcb.gov.au/sites/default/files/resources/2023/Condensation-in-buildings-handbook.pdf
  • CBOS Tasmania, "National Construction Code 2022" (condensation adopted 1 Oct 2023): https://www.cbos.tas.gov.au/newsroom/tech-reg-news-technical-regulations/national-construction-code-2022
  • CBOS Tasmania, climate zones 7 and 8: https://cbos.tas.gov.au/topics/technical-regulation/building-standards/building-practitioners/energy-efficiency
  • ABCB, NCC 2025 adoption dates: https://ncc.abcb.gov.au/ncc-2025/ncc-2025-state-and-territory-adoption-information
  • Standards cited by number only: AS 4200.1:2017, AS 4200.2:2017, AS 1668.2