Site drainage and slab height: what the NCC asks for
Editions covered: NCC 2022 (current in most states), NCC 2025 (WA, VIC, ACT) · Last reviewed 15 November 2026
Water that ponds against a slab or runs under a house causes damp walls, rot, termite risk and footing movement. The NCC sets simple, checkable numbers:
- how far the ground must fall away from the building
- how high the slab and cladding must sit above it
- how subsoil drains and stormwater pipes are laid.
Landscapers, concreters and pavers often change these levels after the building is finished. That's why slab-height and ground-fall defects so often turn up late.
Which edition?
- NCC 2022 applies in NSW, QLD, SA, TAS and the NT.
- NCC 2025 applies in WA, VIC and the ACT from 1 May 2026. WA and the ACT allow a 12-month transition.
- Housing Provisions Part 3.3 and 7.5.7 read the same in both editions.
Where the rules are
- NCC Volume Two H2P1: the Performance Requirement for rainwater management.
- H2D2: drainage is met by either:
- AS/NZS 3500.3 (stormwater drainage), or
- ABCB Housing Provisions Part 3.3, for roofs in areas with a 5-minute rainfall intensity of no more than 255 mm/h (5% AEP), subsoil areas and land next to and under buildings.
- HP 7.5.7: clearance between wall cladding and the ground.
- The NCC doesn't make drainage systems compulsory. These rules apply where a system is installed. Council, as the appropriate authority, generally sets the legal discharge point (H2D2 explanatory information).
Key requirements
-
Ground falls away from a slab (HP 3.3.3(a)): the finished surface around a slab-on-ground must slope away from the building. The minimum fall over the first 1 m is:
- 50 mm in most cases
- 25 mm for reasonably impermeable surfaces such as concrete or clay paving in low rainfall intensity areas, or for a paved access path or ramp that serves the Livable Housing Design requirements.
A low rainfall intensity area is one where the 5-minute rainfall intensity (5% AEP) is no more than 125 mm/h (NCC definition).
-
Slab height above the ground (HP 3.3.3(b)): the slab must sit at least:
- 150 mm above the finished ground in most cases
- 100 mm in low rainfall intensity areas, or in sandy, well-drained areas
- 50 mm above paving or concrete that slopes away from the building as in point 1.
-
Suspended floors (HP 3.3.3(c)): the ground under the house must be graded so it sits above the outside ground level, and water can't pond underneath.
-
Overflow relief gully: the explanatory notes say slab height may also be driven by local plumbing rules. In particular, the overflow relief gully needs to be at least 150 mm below the lowest sanitary fixture to work.
-
Cladding clearance (HP 7.5.7): the bottom of the wall cladding must be at least:
- 150 mm above the finished ground in most cases
- 100 mm in low rainfall intensity areas, or sandy, well-drained areas
- 50 mm above sloping paving.
On suspended floors, cladding must also extend at least 50 mm below the bearer or lowest framing.
-
Subsoil drains (HP 3.3.4): where a subsoil drain is installed to divert groundwater from under a building:
- it needs a uniform fall of at least 1:300
- it must discharge into an external silt pit or sump, whose outlet is at least 50 mm below the inlet invert
- the pit must have access for cleaning.
-
Trenches beside footings (HP 3.3.2(d)): drain trenches next to existing footings must stay within the safe excavation zone, using the slope ratios in Table 3.2.1. Anything deeper needs protection designed by an appropriately qualified person.
-
Stormwater drains (HP 3.3.5):
-
The point and manner of discharge must satisfy the appropriate authority. Examples are a legal point at the boundary, a tank or a soakwell.
-
The system must be designed so overflow in heavy rain can't flow back into the building.
-
Minimum cover for 90 mm Class 6 UPVC stormwater pipe:
- 100 mm under soil
- 50 mm under paving or concrete
- for light vehicle traffic, 75 mm of reinforced concrete or 100 mm of paving.
Other pipe types can allow different cover.
-
-
Termites: slab edges and cladding clearances also form part of termite inspection zones. See our termite guide.
How the states differ
- No state variations: the Housing Provisions schedules list none for Part 3.3 or 7.5.7. The numbers above apply in every state and territory under both editions.
- Discharge and plumbing laws are local:
- Stormwater connection points, on-site detention and soakwell rules are set by councils and state plumbing regulators.
- In Queensland, the Plumbing and Drainage Act 2018 (s 80) prohibits connecting stormwater to a sanitary drain or an on-site sewage facility.
- In WA, NSW and Victoria, check the local government's stormwater requirements on the approval.
- Floor levels: the NCC's explanatory notes to 3.3.3 say the right slab height can also depend on local plumbing rules, storm run-off, cut and fill, the possibility of flooding and termite provisions. Check your approved plans, and ask your state or local council about any floor-level conditions on the approval.
Ask the app
Upload a photo of the slab edge and paving, a silt pit or a stormwater trench, or ask:
- "How high does the slab need to be above the paving?"
- "What fall does the ground need away from the house?"
- "How deep should a 90 mm stormwater pipe be under the lawn?"
- "What fall does an agricultural subsoil drain need?"
- "The landscaper raised the garden bed against the wall. Is that a problem?"
Ask a plumbing question · Earthworks · Concreting · Roof plumbing
Related checklists
- Roof drainage & stormwater: new house (plan required)
- Excavation & retaining: new house (plan required)
- Footings & slab (residential): new house (plan required)
- Related guides: Roof drainage · Slabs and footings · Termite management
FAQ
How high above the ground should a slab be? At least 150 mm above finished ground in most areas. It can be 100 mm in low rainfall intensity or sandy, well-drained areas, or 50 mm above paving that falls away from the house (HP 3.3.3(b)).
What fall does the ground need away from a house? At least 50 mm over the first metre. On impermeable paving in low rainfall intensity areas, or on an accessible path, 25 mm is enough (HP 3.3.3(a)).
Does the NCC require a subsoil drain? No. The NCC doesn't require drainage systems. If a subsoil drain is installed, it must fall at least 1:300 and discharge to a silt pit or sump that can be cleaned (H2D2 and HP 3.3.4).
How much cover does a stormwater pipe need? For 90 mm Class 6 UPVC: 100 mm under soil, 50 mm under paving or concrete, and 75 mm of reinforced concrete or 100 mm of paving under light vehicle traffic (HP 3.3.5(c)).
Where can stormwater discharge? Wherever the appropriate authority accepts, usually the council. Examples are a legal point of discharge at the boundary, a tank or a soakwell (HP 3.3.5 explanatory information).
This is general guidance, not a compliance check. Always check your approved plans, the council's stormwater conditions and the edition that applies to your permit, and confirm details with your certifier, building surveyor or plumbing regulator.
Based on content from the National Construction Code 2022 and 2025 (NCC Volume Two and the ABCB Housing Provisions), provided by the Australian Building Codes Board under the CC BY 4.0 licence. The ABCB does not endorse this guide. The standards the NCC references are cited and explained in our own words, not reproduced.
Sources
- NCC 2022 Volume Two: H2P1, H2D2 and explanatory information, Schedule 1 definition of "low rainfall intensity area"
- ABCB Housing Provisions Standard 2022 (1 May 2023): 3.3.2 to 3.3.5, 7.5.7 and explanatory information. Part 3.3 online: https://ncc.abcb.gov.au/editions/ncc-2022/adopted/housing-provisions/3-site-preparation/part-33-drainage
- ABCB Housing Provisions Standard 2025: the same clauses were compared and no change was found
- NCC 2025 Volume Two, Part H2 (H2D2 and explanatory information, same wording as 2022): https://ncc.abcb.gov.au/editions/ncc-2025/adopted/volume-two/h-class-1-and-10-buildings/part-h2-damp-and-weatherproofing
- Plumbing and Drainage Act 2018 (Qld), s 80, as cited in our roof drainage guide
- ABCB, NCC 2025 adoption dates: https://ncc.abcb.gov.au/ncc-2025/ncc-2025-state-and-territory-adoption-information
- Standards cited by number only: AS/NZS 3500.3