Termite management: what the NCC asks for

Editions covered: NCC 2022 (current in most states), NCC 2025 (WA, VIC, ACT) · Last reviewed 15 November 2026

Termite protection on a new house is mostly settled at slab stage and then forgotten. It comes back as a problem when a path, garden bed or deck later bridges it. Under the NCC, the system is there to stop termites getting into the building through a hidden route. It isn't meant to keep them off the site. This guide sets out when a system is needed for houses and Class 10 buildings, what counts, and what has to be left behind for the owner.

Which edition?

  • NCC 2022 applies in NSW, QLD, SA, TAS and the NT.
  • NCC 2025 applies in WA, VIC and the ACT from 1 May 2026. WA and the ACT allow a 12-month transition.
  • Tasmania used NCC 2025 briefly, then went back to NCC 2022 from 5 June 2026.

Part 3.4 of the Housing Provisions is the same in both editions.

Where the rules are

  • NCC Volume Two H1P1: the structural Performance Requirement lists termite actions among the actions a building must resist.
  • H1D3(3): following ABCB Housing Provisions Part 3.4 satisfies H1P1 for termite risk management.
  • AS 3660.1 Termite management, Part 1: New building work (the NCC references the 2014 edition). We cite this Standard by number only and don't reproduce it. AS 3660.3 covers the test criteria for systems assessed another way.

Key requirements

  1. When a system is needed (HP 3.4.1(1)): both of these must apply.
    • The Class 1 or 10 building is in an area where subterranean termites are a known risk.
    • A primary building element is susceptible to attack.
    • The local authority can usually tell you whether the area is a termite risk (explanatory note to 3.4.1).
  2. Materials treated as not susceptible (HP 3.4.1(2)):
    • steel, aluminium and other metals
    • concrete and masonry
    • fibre-reinforced cement
    • timber that is naturally termite resistant under Appendix C of AS 3660.1, or preservative treated under Appendix D.
    • Only the susceptible primary elements need protecting. The NCC notes that termites can still get in through mortar joints in masonry.
  3. What the system must do (HP 3.4.2):
    • Be chosen to suit each building element from Table 3.4.2.
    • Comply with AS 3660.1, or have passed the tests in Section 5 of AS 3660.3. A system tested that way has to be installed exactly as tested.
    • Have a durable notice (see item 6).
    • If chemical, use a product on the pesticides register, which is the APVMA register.
  4. Options by element (Table 3.4.2, in summary):
    • Slab perimeter or external wall perimeter: slab edge exposure, sheet material, granular material or chemical.
    • Slab penetrations, control joints and the area under the slab: sheet, granular or chemical.
    • Suspended floors: sheet, granular or chemical.
    • Attachments: a system to the attachment itself, or an inspection zone between it and the building. Attachments include downpipes, service pipes, steps, verandahs, ramps, carports, decks, hot-water units and air-conditioners.
  5. Slab not designed to AS 2870 or AS 3600: the whole area under the slab must be treated (Table 3.4.2 note). A slab is only one component of a system. Penetrations and joints still need their own protection.
  6. Durable notice (HP 3.4.3): a permanent notice in a prominent place, such as the meter box, stating:
    • the system used
    • the installation date
    • for chemicals, the life expectancy shown on the register label
    • the installer's or manufacturer's advice on how often to inspect, and what to inspect.
  7. Slab height and drainage interact: the explanatory note to HP 3.3.3 lists termite provisions among the things that can affect how high the slab sits above the finished ground. See our site drainage guide.
  8. Maintenance matters: the ABCB notes that a system relies on regular maintenance and competent inspection. Physical systems are often designed to last, but they still need their inspection zones kept clear.

NCC 2019 difference: the same rules sat in Part 3.1.4 (3.1.4.2 to 3.1.4.4).

How the states differ

  • Queensland (QLD H1P3, QLD 3.4.1(3) to (6), QLD 3.4.2 and QLD Table 3.4.2):

    • A system for a non-temporary Class 1 building needs a design life of at least 50 years. The exception is a system that is easily accessible and can be replenished or replaced, such as a reticulation system under a slab.
    • A chemical used as an external perimeter system must be trenched, treated and backfilled, then covered by a concrete strip at least 50 mm thick and 300 mm wide.
    • Queensland has its own table of acceptable systems.
    • The NCC gives two examples of what can fail the rule: a hand-sprayed chemical under a slab that doesn't last 50 years, and garden mulch built up over a barrier.
  • Northern Territory (NT 3.4.1(2) and NT 3.4.2):

    • Where Mastotermes darwiniensis is prevalent, naturally resistant timber no longer counts as not susceptible, and extra measures are needed.
    • A chemical perimeter system against that species needs the same trench treatment and a 50 × 300 mm concrete strip.
  • Tasmania: the NCC's explanatory note says termites are not considered a risk in Tasmania. Check with your building surveyor before leaving a system out.

  • Victoria: the same note says the risk is lower in parts of Victoria, so ask the council or your building surveyor. The building regulator says chemical systems must be:

    • APVMA-registered
    • tested to AS 3660.3
    • applied to the approved label.

    It also says the owner should be told about the system and its maintenance at handover.

  • NSW, WA, SA and the ACT: no state variation to Part 3.4. The national rules apply.

Ask the app

Upload a photo of the slab edge, penetration collars or the durable notice, or ask:

  • "Does a steel-framed house need a termite management system?"
  • "What has to be written on the termite durable notice?"
  • "Is a hand-sprayed chemical under the slab acceptable in Queensland?"
  • "Does a deck attached to the house need termite protection?"
  • "Is slab edge exposure enough on its own?"

Ask a builder question · Concreting · Carpentry

Related checklists

FAQ

Is termite protection required on every new house? No. The NCC requires it only where termites are a known risk in the area and a primary building element is susceptible. A house framed entirely in steel, or in treated or naturally resistant timber, may only need the susceptible parts protected (HP 3.4.1).

Does a concrete slab count as termite protection? Only as one component. Table 3.4.2 treats the slab perimeter, penetrations, control joints and attachments separately, and each needs its own measure. If the slab isn't designed to AS 2870 or AS 3600, the whole area under it must be treated.

Where does the termite notice go and what does it say? In a prominent place such as the meter box. It states the system, its installation date, the chemical's life expectancy if one is used, and the recommended inspection frequency (HP 3.4.3).

Can I use any termite chemical? The chemical must be on the pesticides register (the APVMA scheme) and, under AS 3660.1, applied as its label requires. In Queensland, a chemical system also has to meet the 50-year design life, or be able to be replenished.

Do decks, steps and downpipes need protection? Yes, if they are attached to the building. Each needs either its own termite management or an inspection zone between it and the building (Table 3.4.2).


This is general guidance, not a compliance check. Always check your approved plans and the edition that applies to your permit, and confirm details with your certifier or building surveyor.

Based on content from the National Construction Code 2022 and 2025 (NCC Volume Two and the ABCB Housing Provisions), provided by the Australian Building Codes Board under the CC BY 4.0 licence. The ABCB does not endorse this guide. The standards the NCC references are cited and explained in our own words, not reproduced.

Sources

  • NCC 2022 Volume Two: H1P1, H1D3(3), QLD H1P3 and QLD H1D3(3)
  • ABCB Housing Provisions Standard 2022 (1 May 2023): Part 3.4 (3.4.1 to 3.4.3, Table 3.4.2 and notes), QLD 3.4.1(3) to (6), QLD 3.4.2, NT 3.4.1(2), NT 3.4.2, and the explanatory note to 3.3.3
  • ABCB Housing Provisions Standard 2025: Part 3.4. Compared clause by clause and no change found. Online: https://ncc.abcb.gov.au/editions/ncc-2025/adopted/housing-provisions/3-site-preparation/part-34-termite-risk-management
  • NCC 2025 Volume Two, Part H1 (H1D3 and QLD H1P3), online: https://ncc.abcb.gov.au/editions/ncc-2025/adopted/volume-two/h-class-1-and-10-buildings/part-h1-structure
  • ABCB, NCC 2025 state and territory adoption dates: https://ncc.abcb.gov.au/ncc-2025/ncc-2025-state-and-territory-adoption-information
  • Victorian Building Authority (now the Building and Plumbing Commission), "Requirements of chemical termite management systems" (2022): https://www.vba.vic.gov.au/news/news/2022/requirements-of-chemical-termite-management-systems
  • NT Government, "Termite protection": https://nt.gov.au/property/building/build-or-renovate-your-home/termite-protection
  • Standards cited by number only: AS 3660.1:2014, AS 3660.3:2014, AS 2870, AS 3600